Priorities for descriptions
From Ease Gill
This page lists the priorities for descriptions (but is not intended to be prescriptive).
Phase 1[edit | edit source]
Phase 1 aims to include the main entrances and the major routes between them.
- 88' Pitch and Wormway (better description needed);
- Bye George;
- Peterson Pot (check description from Hall of the Mountain King into Peterson Pot).
Phase 2[edit | edit source]
Phase 2 aims to include all the commonly visited entrances, and other important passages in the cave.
- Sylvester Pot (to Main Chamber);
- Delicate Sound of Thunder Choke, leading to Luff's Passage and Hall Hall
- Cow Pot;
- Clough's Aven: better description of second pitch;
- Serendipity;
- Ratbag Inlet;
- Pippikin Lower Streamway;
- Gothic Series and Hall of the Damned;
- Gour Hall;
- Misty Mountain Series.
Phase 3[edit | edit source]
Phase 3 aims to include all the remaining entrances, and various passages to allow the creation of interesting trips.
- Limerick Passage;
- Slit Sinks, New Slit Sinks (connecting to Borehole);
- New Cave (connecting to Wretched Rabbit);
- Corner Sink, Swindon Hole (connecting to Trident Series; probably needs digging open);
- Cow Dubs 2 (connecting to County Pot; probably needs digging open);
- Magic Roundabout;
- Grind Circle.